1. State Key Laboratory of Explosion Impact and Disaster Prevention & Mitigation, Army Engineering University of PLA, Nanjing Jiangsu 210007, China;
2. Training Base, Army Engineering University of PLA, Xuzhou Jiangsu 221004, China;
3. Army Logistics University of PLA, Chongqing 401311, China
Optimization Construction Scheme of Single-sided Shallow Tunnel Enlarging
TAN Yi-zhong1,2, LIU Yuan-xue3, CAI Shou-jun2, WANG Pei-yong3, CHEN Yu-long2
1. State Key Laboratory of Explosion Impact and Disaster Prevention & Mitigation, Army Engineering University of PLA, Nanjing Jiangsu 210007, China;
2. Training Base, Army Engineering University of PLA, Xuzhou Jiangsu 221004, China;
3. Army Logistics University of PLA, Chongqing 401311, China
摘要At present, the construction schemes of tunnel enlarging are analogized by creating a new tunnel through a traditional method. However, the traditional excavation method ignores the advantage of long-term support and stability of the original tunnel lining to the surrounding rock, and the construction efficiency is also reduced. The optimized construction plan was theoretically analyzed using the case of the Chongqing Yuzhou tunnel enlarging. The optimization construction schemes of single-sided shallow tunnel enlarging were extracted in accordance with the foundation of the study on the construction mechanics of a shallow tunnel, that is, the way of the rational arch axis enlarging in the crosswise direction and the jump-driving method in the lengthwise direction. The construction analysis was compared with the field monitoring measurement results and ANSYS simulation of the 3D finite element calculation of the entire tunnel enlarging process. By optimizing the construction scheme, the calculation value of the compressive stress of the original tunnel lining was increased by excavation face advancing. The original tunnel lining that had not been dismantled can play the role of the column and bear the surrounding rock pressure caused by the jet-hopping excavation. This lining could effectively improve the safety and stability for tunnel enlarging. The adopted rational arch axis excavation in the transverse direction could reasonably and significantly transfer the surrounding rock pressure. This process could reduce the tensile stress and increase the compressive stress of the initial support structure. Results of the numerical calculation and field monitoring data showed that the excavation scheme of the shallow tunnel is optimized after unilateral expansion. The optimization construction schemes can change the original rock stress path and play a role in the surrounding rock stability. The displacement of the tunnel vault can be reduced by 16%-20%, and the tunnel vault does not appear in the tension zone. The optimization of construction scheme can reduce the arch subsidence and tensile stress of the lining, ensure the safety of construction, and shorten the construction period. These obtained beneficial conclusions can be supplied to the next similar tunnel enlarging projects.
Abstract:At present, the construction schemes of tunnel enlarging are analogized by creating a new tunnel through a traditional method. However, the traditional excavation method ignores the advantage of long-term support and stability of the original tunnel lining to the surrounding rock, and the construction efficiency is also reduced. The optimized construction plan was theoretically analyzed using the case of the Chongqing Yuzhou tunnel enlarging. The optimization construction schemes of single-sided shallow tunnel enlarging were extracted in accordance with the foundation of the study on the construction mechanics of a shallow tunnel, that is, the way of the rational arch axis enlarging in the crosswise direction and the jump-driving method in the lengthwise direction. The construction analysis was compared with the field monitoring measurement results and ANSYS simulation of the 3D finite element calculation of the entire tunnel enlarging process. By optimizing the construction scheme, the calculation value of the compressive stress of the original tunnel lining was increased by excavation face advancing. The original tunnel lining that had not been dismantled can play the role of the column and bear the surrounding rock pressure caused by the jet-hopping excavation. This lining could effectively improve the safety and stability for tunnel enlarging. The adopted rational arch axis excavation in the transverse direction could reasonably and significantly transfer the surrounding rock pressure. This process could reduce the tensile stress and increase the compressive stress of the initial support structure. Results of the numerical calculation and field monitoring data showed that the excavation scheme of the shallow tunnel is optimized after unilateral expansion. The optimization construction schemes can change the original rock stress path and play a role in the surrounding rock stability. The displacement of the tunnel vault can be reduced by 16%-20%, and the tunnel vault does not appear in the tension zone. The optimization of construction scheme can reduce the arch subsidence and tensile stress of the lining, ensure the safety of construction, and shorten the construction period. These obtained beneficial conclusions can be supplied to the next similar tunnel enlarging projects.
基金资助:Supported by the China Postdoctoral Science Foundation(No.2018M643854); the Jiangsu Planned Projects for Postdoctoral Research Funds in China(No.2018K047A)
通讯作者:
TAN Yi-zhong
E-mail: tanyizhong@163.com
引用本文:
谭仪忠, 刘元雪, 蔡守军, 王培勇, 陈愈龙. 浅埋隧道单侧扩建优化施工方案探讨[J]. Journal of Highway and Transportation Research and Development, 2019, 13(2): 45-55.
TAN Yi-zhong, LIU Yuan-xue, CAI Shou-jun, WANG Pei-yong, CHEN Yu-long. Optimization Construction Scheme of Single-sided Shallow Tunnel Enlarging. Journal of Highway and Transportation Research and Development, 2019, 13(2): 45-55.
[1] QIAN Qi-hu. Greeting Development Climax of Urban Underground Space in China[J]. Chinese Journal of Geotechnical Engineering, 1998,20(1):112-113. (in Chinese)
[2] LIU Dong, GAO Wen-xue, SUN Bao-ping, et al. Numerical Simulation of Blasting Vibration on Existing Tunnel Extension[J]. Rock and Soil Mechanics, 2016,37(10):3011-3017. (in Chinese)
[3] LI Yuan-fu. Construction Technology of Tunnel Extension for Guancunba Tunnel[J]. Railway Construction Technology, 1996(4):22-26. (in Chinese)
[4] PENG Nian. Study on Surrounding Rock Mechanical Response Mechanism of In-situ Expanded Tunnel[D]. Chongqing:Chongqing University, 2010. (in Chinese)
[5] GAO Gan, LIU Yuan-xue, XU Guang-wei, et al. Study on the Blasting Vibration in Tunnel Extension[J].Chinese Journal of Underground Space and Engineering,2010,6(6):1285-1294. (in Chinese)
[6] GAO Gan, LIU Yuan-xue, ZHOU Jie-zhong, et al. Study on Underground Space Enlargement Options[J]. Modern Tunnelling Technology, 2010,6(6):1-9. (in Chinese)
[7] LUNARDI P. Widening the Load at Nazzano[J]. Tunnels & Tunneling International, 2003(7):16-19.
[8] OZSANA A, KARPUZB C. Preliminary Support Design for Ankara Subway Extension Tunnel[J]. Engineering Geology, 2001,59:161-172.
[9] ZHENG Yin-ren, ZHAO Shang-yi, LI An-hong, et al. FEM Limit Analysis and Its Application in Slope Engineering[M]. Beijing:China Communications Press,2011. (in Chinese)
[10] AN Yong-lin, HUANG Kan, PENG Li-min, et al. Analysis of Tunnel Stability Based on Strength Reduction Method[J]. Journal of Highway and Transportation Research and Development,2001,28(4):91-96. (in Chinese)
[11] LI Yu-chuan. Study on Mechanical Behavior of Extension of Existing Tunnel Project[D]. Chendu:Southwest Jiaotong University,2008. (in Chinese)
[12] BHASIN R, GRIMSTAD E. The Use of Stress-strength Relationships in the Assessment of Tunnel Stability[J]. Tunnelling and Underground Space Technology,1996,11(1):93-98.
[13] WU Zu-song. Research on Calculation Method and Monitoring of Surrounding Rock Pressure for Highway Tunnel[D]. Chongqing:Chongqing Jiaotong University,2008. (in Chinese)
[14] WANG Yong-fu. Application of Strength Reduction Finite Element Method in Tunnel Stability Analysis[D]. Chongqing:Chongqing Jiaotong University,2010. (in Chinese)
[15] WANG Xian-chun, ZHUANG Ji-dong, ZHANG Hong-bo. Analysis on Impact of Construction of Shallow-buried Soft Ground Tunnels on Deformations of Ground Surface and Surrounding Rock Mass[J]. Tunnel Construction, 2006,26(1):21-24. (in Chinese)
[16] TAN Yi-zhong, LIU Yuan-xue, ZHOU Jie-zhong. Research on Proper Excavation Steps in Tunnel Extension[J]. Journal of Logistical Engineering University, 2011,27(5):8-12. (in Chinese)
[17] TAN Yi-zhong, LIU Yuan-xue, ZHOU Jia-wu. The Proper Driving Footage in the Jump-driving Method for Single-sided Tunnel Extension[J]. Chinese Journal of Underground Space and Engineering, 2013(1):147-154. (in Chinese)
[18] YANG Ming-hui, WANG Luo-cheng, ZHAO Ming-hua. Calculation of Soil Pressure against Double-row Anti-slide Piles Considering Soil Arching Effect[J]. Journal of Highway and Transportation Research and Development, 2011,28(10):12-18. (in Chinese)
[1]
柳厚祥, 查焕奕, 王真, 蒋武军. 基于掌子面结构量化的公路隧道围岩分级方法研究[J]. Journal of Highway and Transportation Research and Development, 2019, 13(3): 62-69.
[2]
杨相如. 海底隧道衬砌混凝土高温后性能试验研究[J]. Journal of Highway and Transportation Research and Development, 2018, 12(3): 53-59.
[3]
肖大海, 谢全敏, 杨文东. 基于多变量的集成预测模型在隧道拱顶沉降变形预测中的应用[J]. Journal of Highway and Transportation Research and Development, 2018, 12(3): 46-52.
[4]
罗福君, 周晓军, 王媛, 张福麟. 框架型棚洞承受落石冲击力的模型试验研究[J]. Journal of Highway and Transportation Research and Development, 2018, 12(2): 59-66.
[5]
肖旺, 郭全元, 苏永华. 考虑峰后特性的隧道围岩锚固力学效应[J]. Journal of Highway and Transportation Research and Development, 2017, 11(1): 49-58.
[6]
史晓花, 杜志刚, 周立平, 李平凡. 公路隧道中部视错觉减速标线优化研究[J]. Journal of Highway and Transportation Research and Development, 2016, 10(4): 63-70.
[7]
石钰锋, 罗青, 赵秀绍, 皮圣. 浅覆大跨度小净距隧道中岩墙及初支力学特性研究[J]. Journal of Highway and Transportation Research and Development, 2016, 10(3): 51-59.
[8]
胡俊, 王平. 含EPS颗粒夹层的隧道结构抗爆性能有限元分析[J]. Journal of Highway and Transportation Research and Development, 2016, 10(2): 53-58.
[9]
邵良杉, 徐波. 基于因子分析与Fisher判别分析法的隧洞围岩分类研究[J]. Journal of Highway and Transportation Research and Development, 2015, 9(4): 50-57.
[10]
王如意, 闫倩倩, 田波, 谢晋德. 含湿量和纤维对隧道二衬混凝土高温性能的影响[J]. Journal of Highway and Transportation Research and Development, 2015, 9(3): 63-68.
[11]
汪波, 王杰, 吴德兴, 徐建强, 赵玉东. 让压支护技术在软岩大变形隧道中的应用探讨[J]. Journal of Highway and Transportation Research and Development, 2015, 9(3): 69-77.
[12]
宋克志, 李福献, 朱雷敏, 王梦恕. 隧道二衬结构受力影响因素的敏感性分析[J]. Journal of Highway and Transportation Research and Development, 2014, 8(4): 69-75.
[13]
石钰锋, 林辉, 阳军生, 徐长节. 软弱地层浅埋隧道加固范围及强度参数的研究[J]. Journal of Highway and Transportation Research and Development, 2014, 8(4): 76-81.
[14]
石钰锋, 阳军生, 杨峰, 唐鹏. 软弱围岩大断面隧道相向施工围岩稳定性分析与掌子面加固研究[J]. Journal of Highway and Transportation Research and Development, 2014, 8(1): 52-60.
[15]
信春雷, 高波, 隋传毅, 周裕. 深埋高水位山岭隧道支护与衬砌外水压力分析[J]. Journal of Highway and Transportation Research and Development, 2014, 8(1): 61-66.